The city is spending over $1.1 million to replace a failing metal pipe system with a large concrete box culvert to reduce flooding near downtown.
At a glance
- Total mentions
- 1
- Last 30 days
- 0
Last discussed Jan 27, 2026.
Impact analysis
Cost not to exceed $1,110,151 funded from stormwater rate revenues.
Properties upstream and surrounding the Front Street drainage basin.